On the afternoon of October 15, 2025, it was overcast with haze. The elevation of Yong'an Stone Bridge is considerably lower than the current ground level—what was originally meant to be the bridge deck above the ground is now slightly below the new road surface, likely due to sedimentation. The road winds around both sides of the bridge deck, forming a peculiar shape. The modeling should include the bridge and the encircling highway.